The carrier for the clutch
The dam around the bottom male for the X-30
Some of the items that were entombed in the X-30
Mixing the X-30… before it expanded out of the bucket
The mess caused by the X-30 incident
A casualty of the X-30 incident
The bottom, popped
The bottom molds next to each other
Mike filling the hole in the mold
Wet sanding the bottom
Wet sanding in the dark
The bottom, post waxing, PVA and application of vacuum tape
Chris preparing the carbon for the lay-up
Mike in his dress Tyvek
Laying the breather in after applying the epoxy
Bagging the mold
Attaching the vacuum bag with the tape
Taping a loop
Vacuum activated
Previous |
Features
| Next