Arranging engine, brake, and CVT mounts for placement into the bottom fairing.
Weights hold down mounts curing in Hysol adhesive.
Making sure the mounts don't move.
After hysol-ing, we layed up over the mounts with carbon fiber and nomex honeycomb. Since we couldn't get a vacuum on this, we went with a water bath layup.
The flooded engine compartment.
Getting the engine on the dyno.
Thomas and Dylan doing more testing later that night.
Dylan checks some readings on his laptop.
Andrew C priming the oil pump, a rite of ascension.
Still going.
I think he's pretty well initiated now.
Back